SYSMAC NET Link Unit.
A Bus Connection Unit must be ordered separately.
C200HS Communications SYSMAC NET Interface C200HS-SNT32.Type of input: AC voltage input.
Output type: communication; RS-485; NPN open collector (HH, H, PASS, L, LL).
Event input terminal 5 points (TIMING, S-TIM, HOLD, RESET, ZERO) is equipped with.
External supply 80mA DC12V.
Power supply voltage: AC100 ~ 240V.
96 (W) * 48 (H * 95mm) depth
Some models are not equipped with
EE9-C01
The most suitable voltage and current signal simulation, measurement and display, identification of the panel table.
Action determine the color, can switch the green / Red 2 kinds of color display.
Equipped with the sub pressure gauge for monitoring the operation trend.
External event input can be applied to a variety of measurement and identification situations.
DeviThese Best-selling General,
purpose Temperature Controllers,
Are Now Even Better.
Controllers now available with analog inputs.
Faster sampling at 250 ms.
Transfer output provided for easy output to recorders.
Models available with a loop break alarm (LBA) and,
heater short alarm (HS alarm).
Manual output provided.
Easy setting with 11-segment displays.
New protocol called Modbus is installed in the,
models with communications.
USB-Serial conversion cable is available.
Note: Refer to Precautions on page 33. Time specification: Inverse type.
Current setting range: 20 to 65 A.
Operating voltage: 100/110/120 VAC.
Resetting method: Manual.
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,
is indicated from the start of operation.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, and load conditions. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
EE9-C01 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=EE9-C01&select=5