Control output: Relay output.
Auxiliary output: Two.
Communications: --.
Heater burnot: --.
Event inputs: --.
Power supply voltage: 100 to 240 VAC.
The E5DC-800 Mounts to DIN Track and Is Ideal,
for Connections to HMIs and PLCs.
It provides the Same Easy Operation and,
Advanced Performance as the Rest of the,
E5@C-800 Series E3Z-GN11B INSTRUCTION sheet.
A slim body at 85 × 22.5 mm (D × W) that fits into narrow control,
panels and mounts to DIN Track
E3Z-GN11B
Removable terminal block for easy replacement to simplify maintenance.
High-speed sampling at 50 ms for applications with high-speed,
temperature increases.
Easy connections to a PLC with programless communications.
Models are available with up to 2 auxiliary outputs and 1 event input to,
complete basic functions E3Z-GN11B INSTRUCTION sheet.
A white PV display (height: 8.5 mm) is easy to read when setting up,
checking alarms, and making settings in a control panel. Size: 48 x 96mm.
Ontology: terminal type, temperature input type.
Category: control output 1 point type (power supply AC100 ~ 240V).
Shell color: black.
Control output: voltage output (SSR driver).
Control mode: standard or heating cooling E3Z-GN11B INSTRUCTION sheet.
Auxiliary output points: 3 points.
Heater with broken wire, SSR fault, heater over current detection function /ES1B power supply: ES1B power supply.
Event entry point: 2.
Transfer output: -.
Communication: -.
The general temperature controller 96mm, 48 * 96mm square has been upgraded to improve the performance and function of /.
Indicates that the accuracy of the upgrade, increase the function of prevention and maintenance, further enhance the performance.
Add PV/SV state display function, to see the state of the thermostat
(automatic / manual, RUN/STOP, alarm), interactive display PV/SV E3Z-GN11B Manual.
Increase the number of control output ON/OFF counting function, can prevent the maintenance of temperature controller internal relay.
Increased the 3 segment display, which cann display the current value / target / operation E3Z-GN11B Manual.
Increased the PF key, the distribution of automatic / manual, RUN/STOP, etc., can be a key operation.